The installation required careful planning to take into consideration patterns in the concrete with the coverage of the patio and pool areas. Once the design was set, the installation was fast.
While the installation went smoothly, the trip to Mexico was a bit of an adventure. It started with Vince’s client suggesting a road trip with a late model Rolls Royce …but that’s another story.